The Cherry Hill Department of Engineering will continue work on the 2014 Road Maintenance Program this week, with work scheduled to begin around Monday, July 13, on Old Carriage Road from Wayside Drive to Kitty Hawk Road. All work will be done as weather permits.
Work includes a total resurfacing of the road, as well as isolated concrete work in areas where trip hazards are present.
Trash pickup and local traffic will remain undisturbed. Parking may be affected during work hours. Local resident will be notified.
This work is being done as part of the Cherry Hill Township’s Road Maintenance Program, which consists of the mill and overlay of nearly two dozen roads within the township and isolated replacement of concrete curbs, sidewalks and driveway aprons.
To learn more about the Road Maintenance Program, contact Bob Lee or Kevin McCormack in the Department of Engineering at (856) 424–3203.